Rotational, controlled power cuts began at 6.52 pm on Wednesday, implemented by the Cyprus Transmission System Operator (CTSO) across the whole of Cyprus, due to an inability to meet demand as a result of faults at EAC power stations.
The full text of the news item is available in the paid version of the CNA web service.Sign in